How much does it cost to build a house in Lahore in 2026?
Whether you are building a 5 marla family home or a 2 kanal luxury residence, understanding construction costs in Lahore is essential before you begin. These figures are based on current market rates as of 2026 and reflect the cost of working with qualified professionals — not informal contractors.
Grey structure cost per square foot in Lahore 2026
Grey structure includes foundation, walls, roof slab, cement plaster, basic plumbing and electrical conduit, and staircase. It does not include finishing, fixtures, or interior work.
Standard grey structure: PKR 3,000–3,600 per sq ft
Basement grey structure: PKR 4,000–4,600 per sq ft (due to excavation, dewatering, retaining walls, and waterproofing)
Cost by plot size
5 marla house construction cost
Typical covered area: 1,800–2,100 sq ft
Grey structure: approximately PKR 55–75 lacs
Turnkey (complete with finishing): approximately PKR 1–1.7 crore
10 marla house construction cost
Typical covered area: 3,000–3,500 sq ft
Grey structure: approximately PKR 90 lacs–1.25 crore
Turnkey: approximately PKR 1.8–3 crore
1 kanal house construction cost
Typical covered area: 5,000–5,500 sq ft
Grey structure: PKR 1.5–2 crore
Turnkey: PKR 2.75–4.5 crore
Premium/luxury: PKR 5–8+ crore
2 kanal house construction cost
Typical covered area: 8,000–10,000 sq ft
Turnkey: PKR 5–10+ crore
Premium projects can exceed PKR 15 crore
Farmhouse construction cost near Lahore
Covered area: 4,000–8,000+ sq ft
Turnkey: PKR 4–10+ crore depending on scale, landscape, and finishes
What affects the cost?
The final cost depends on several factors: the number of storeys, whether there is a basement, the quality of finishes (standard vs premium vs luxury), the complexity of the architectural design, structural requirements, and the level of interior design and custom joinery. Costs also vary by area — DHA, Bahria Town, Gulberg, and farmhouse locations each have different logistical considerations.
What is included in turnkey cost?
Turnkey means the house is ready to move into. It includes grey structure plus all finishing: flooring, bathrooms, kitchen, paint, doors, windows, electrical fittings, plumbing fixtures, HVAC, and basic landscaping. It does not typically include furniture, curtains, or appliances unless specified.
Architectural design fees
Design fees depend on the project scale and scope. At QualityGhar, we provide a clear fee proposal after the initial consultation — no hidden charges. Design fees are separate from construction costs and cover floor plans, 3D visualization, front elevation design, working drawings, and approval submissions.
How we handle billing
Construction payments are structured in phases — you approve each phase before the next begins. Grey structure billing is typically lump sum per phase. Finishing work is billed on a percentage basis with transparent documentation. Every payment is itemized so you see exactly where your money goes.
Managing costs from abroad
If you are based overseas, we send weekly photo and video updates via WhatsApp so you can verify progress and quality remotely. Monthly video call walkthroughs keep you connected to every decision. We have completed 40+ projects for families in the UAE, Saudi Arabia, UK, USA, Canada, Australia, and Germany.
